INTERIOR FIT-OUT WORK


While most design work is carried out during the pre-construction phase of a Project, Design team, including Interior Designer, usually continue to provide their services during the construction phase. In this phase, Interior designer work in tandem with architects, contractors, and manufacturers to ensure all physical structures and architectural elements are aligned with the Owner’s vision and business requirements.

Industrial Street 18, Gate 133
Doha, Qatar

Tel: +974 6699 0529
        +974 3338 5855 
[email protected]